As you can see there was a change in the cabinet, I added a sitting bench to it that also added more space for the equipment as the top is hinged in two sections that give access to the inside. I also started the trim work and got the lights added to the book shelves they are controlled with a dimmer, also got the glass shelves in place.
From this view you can see the 26 gal. tank that will be used in the making of the sump/refug. hopefully by the next time I post the cabinet will be done and stained and the sump/refug. done.